Project Description

London Olympic Village

Olympic Village included 11 residential plots with 2,818 homes in 63 buildings, providing thousands of bed spaces for the London 2012 Olympic and Paralympic Games

The development included a variety of off-site prefabricated elements including:

  • Honeycomb precast construction
  • Fully fitted volumetric modules (incl. fittings and furnishings)

Prefabricated and Modular Building Services

  • Corridor Modules
  • Modular packaged plant rooms
  • Modular Risers
  • Utility Cupboards

Delivered 6 months ahead of schedule

Due to the location and constraints of this facility in London (UK) Congestion and multiple Deliveries of components wasn’t acceptable. Therefore this project had to be coordinated with precision. Moving construction offsite enabled us to reduce site deliveries by over 45% and allowed for a concurrent production during site preparation in order to reduce the overall construction time.

30% Time and Labour Saving

Leveraging off-site prefabrication enabled this project to be completed with an approximate saving of 30% on time and labour versus a traditional M&E approach.

Olympic VIllage London

Recent Projects